C2 Lab Complete Coordination Lab
Coordination Session Utilizing 3-D Revit Model & Clash Detection
Clash detection for systems designed in- house as coordinated with architectural sections and reflected ceiling plans
Real Time, Interactive, 3D Revit Model Lab
Structural Review:
- Structure dimensions and placement
- Footing dimensions and depths
- Braced frame locations
- Shear wall locations
Mechanical Review:
- Duct dimensions and routing
- Equipment dimensions and locations
- Piping and routing
- Louver and air device locations
Electrical Review:
- Panel locations
- Equipment power coordination
- Lighting locations
Plumbing Review:
- Sloped piping routing
- Equipment dimensions and locations

Participants may include:
- In-house Design Team
- Architect
- Building Owner
- General Contractor
- Construction Manager
- Structural
- Mechanical
- Electrical
- Plumbing
- Commissioning
Our 3D BIM modeling assists us in finding and correcting construction conflicts during the design process. Our procedures and internal systems facilitate inter-discipline coordination. This proactive approach saves the project design team, construction team, and owner team considerable time, money, and headache.