3-Dimensional Building Information Modeling

C2 Lab Complete Coordination Lab

Coordination Session Utilizing 3-D Revit Model & Clash Detection

Clash detection for systems designed in- house as coordinated with architectural sections and reflected ceiling plans

Real Time, Interactive, 3D Revit Model Lab

Structural Review:

  • Structure dimensions and placement
  • Footing dimensions and depths
  • Braced frame locations
  • Shear wall locations

Mechanical Review:

  • Duct dimensions and routing
  • Equipment dimensions and locations
  • Piping and routing
  • Louver and air device locations

Electrical Review:

  • Panel locations
  • Equipment power coordination
  • Lighting locations

Plumbing Review:

  • Sloped piping routing
  • Equipment dimensions and locations



Participants may include:

  • In-house Design Team
  • Architect
  • Building Owner
  • General Contractor
  • Construction Manager

  • Structural
  • Mechanical
  • Electrical
  • Plumbing
  • Commissioning

Our 3D BIM modeling assists us in finding and correcting construction conflicts during the design process. Our procedures and internal systems facilitate inter-discipline coordination. This proactive approach saves the project design team, construction team, and owner team considerable time, money, and headache.

All disciplines working from a shared 3-D building model!